beerlao water line project
OWNER: Lao brewery Co., LTD
LOCATION: KM.12 Thadeua Road, Hatsayfong District, Vientiane Capital, Lao PDR, PO Box 1016
The Employer requires to follow hygienic designs to be based on the construction of a new filler machine. PU flooring. the drainage system in the production hall of the CSD plant and open construction wall for removal-bring machine and equipment to place.
PROJECT START: 01 FEB 2021
CONSTRUCTION PROGRESS: 46.43%
CONSTRUCTION PERIOD: 10 months
VALUED: 5,229,626.70 USD